| Working Bees Schedule 2003
|
| Second coat on Changing Shed. "Blue Smoke" ( Ladders & brushes ) | |
| First & Second coat on Opti Shed " Blue Smoke" ( Ladders & brushes ) | |
| Paint doors windows and soffits "White" | |
| Paint DeckTread on South steps of Club. | |
| BWOF inspections and sign log book | |
| Window in kitchen | |
| Floor drain in women's change room | |
| Water leaking into North Boat shed | |
| Inspect concrete beam shedding as a result of rebar corrosion | |
| Gate padlock install | |
| Optished padlock. Make fit universal key. | |
| Flag system. Still not operational in a reliable way. | |
| Security alarm. Get working properly. | |
Contractor Tasks
| Main door of boat shed. Repairs ( Alfex ) | |
| Mens urinal fix ( Vic Philpott ) | |
| Flashings on N&S ends of Club House ( Vic Philpott ) | |
| Complete North Deck storage box ( ??? ) | |
Weeknight Working Bees
Thursday 22nd August
2002
Sunday Working Bee
Sunday 25th August 2002
Andrew Paterson runs Building Working Bees. 970 8454 or Email Webmaster@wbbc.wellington.net.nz
Task
List in a sort of Priority.
( Volunteers names are in brackets ... tasks with a
"who?" are awaiting a volunteer)
The priority system is:
1. Legal & Safety& Security
2. Building Integrity
3. Sailing Management
4. Interior Painting and Finish and furnishings.
| Legal & Safety & Security | |
| Security Alarm. Power and phone line ready to go. It is now connected and works. Two of the PIRs do not seem to be behaving. Nearly there. ( in hand Andrew P ) | |
| Chain & padlock for Gate. ( who ?) | |
| Building Integrity ( = fix and prevent leaks or security problems) | |
| Roof Flashing North End over womens toilets to stop rain ingress and mould in toilet. ( Richard D gunk gun ) | |
| Paint external wooden walls of Boat Shed / Changing Room Building including the big door. Same colour as Club House. ( Special Working Bee proposed during 2002-2003 season ) | |
| Sailing Management | |
| Flag system. Refine to ensure the flags do not bind around halyards or pole. ( Steve ) | |
| Trim seaweed along start line area. ( Dave W ?) | |
| Anaenometer. New. ( Maurice ? ) | |
| Starting Hooter (240v). Set it up permanently, cable into Start Box with button. ( in hand Andrew & Tim ) | |
| Venitian Blinds for North Window Start Box. So it is possible to see the computer screen. ( in hand Glen S ) | |
| Interior New Works | |
| Storage box on North Deck. ( Richard D.) | |
| New Trophey Display cabinet. (in hand Richard M, Peter H et al. ) | |
| Storage cupboard nr Toilets. ( Richard D. ? ) | |
| Interior Fitout (Painting , Doors, Furniture etc ) | |
| Clean the ramp. Debate on what to do. Current plan is to leave it. | |
| Fill Holes in kitchen bench. (where beer pump was) |
| Renew Small Boat Safety Check List sign on South Shed Door. Stick on poster available at club. |
Tasks for Later Working Bees ....... (volunteers required?)
| North Shed Door. Trim nosing and Install aluminium nose on doors that meet up. | |
| Prepare a new place for Rubbish Bins. Pour concrete. |
Completed Works:
| Men's change room door. Rehang so it closes properly. ( Richard D ..advise ) | |
| Club Steps. Repaint non slip. Paint available at club. Aldos Decktread. On a fine day with no too many people about. Has to be redone each season.( who ?)Plumbing works for WCC kitchen consent compliance & tap in Womens Change room and electric shock south shed water tap( in hand Andrew P) | |
| Soffits around club house and boat shed. Cut to width and prepaint then install. Need materials. Use cherry picker for easy access. | |
| New Kitchen Storage pantry. (in hand Richard M , Peter H et al. | |
| Varnish 2nd Coat. Mens & Womans Toilets. Materials all avail. ( who? a good Sunday job ) | |
| Get rid of junky & rusting old furniture. Trailer load to dump please. (who?) | |
| Complete construction of computer furnture. ( Richard D) then Paint/varnish computer furniture. | |
| Replace Florescent tubes South Shed. Materials Available. ( Andrew P ) | |
| Holes in Start Box floor. Either fill with dowell or cover. | |
| Furniture legs. Check for raw steel bottoms. Protect new floor with plastic caps. | |
| Swinging Doors, Paint with SeaFog Enamel. (who? )( thanks Craig for striping them ) | |
| Finish painting Murray Lounge incl Doors. Materials all avail.( Glen S ). Nearly complete. | |
| Finish painting the Entrance hall and doors. Also the Storage Cupboard. Materials all avail. ( Glen S) | |
| Rehang pictures ( Richard M et al. ) | |
| Relocate North Notice Board. ( done Richard M et al. ) | |
| 3x Telephones and modem all connected and working | |
| SSB Radio. Drill hole to bring aerial cable into Start Box, solder new BNC connector. Install microphone clip, rack. Done Aug 2002) | |
| Security Floodlight on day/night switch. New tube. Done Aug 2002 | |
| Post currrent Building Warrant of Fitness Done Aug 2002 | |
| Front door lock barrel replaced. Done Aug 2002. | |
| Interior painting 2nd coat. Done Aug 2002 | |
| Replace light switch in South Shed. Done Aug 2002. | |
| WBBC sign in car park. Done 2002 Thks Phil Williams |
| Polish and seal all club silver-ware and awards, so it stays bright in the cabinet. Done 2002 | |
| Breast work at Rescue boat berth. Complete rebuild required. Done 2002. |
| Paint Orange Start line on outside of start box. Done 2001 | |
| Place a "start line" on start box window. Done 2001 |
| Paint outside walls 2nd Coat (West, South and North) of Club House. Done 2001 | |
| Install new start box flag pole system. Done 2001 |
| South wall of womens change rooms reconstructed. Done 2001. | |
| Clum M&W Toilets refurbished. Done 2001 | |
| New aluminium windows on North, East and South sides of Club House. Done 2001. | |
| North Shed sliding doors. Replace runners in Henderson door track. Done 2001 | |
| Sanding and Varnishing floor. Done 2001. | |
| Painting all interior walls "Sea Fog". 1st Coat Done 2001. | |
| Boat Shed / Change Rooms. New Roof. Installed during Rowies Autumn Series 2001. | |
| Changing rooms reinstall flor drains. Done 2001 | |
| Men's change room. Refinish floor. Done 2002 Thks Richard Dreverman | |
| Mens change. Repainted interior. | |
| Mens change. Flusher control installed. |
|